IT認証試験問題集
毎月、GOWUKAKUは1500人以上の受験者が試験準備を助けて、試験に合格するために受験者にご協力します
 ホームページ / HPE6-A80 問題集  / HPE6-A80 問題練習

HP HPE6-A80 問題練習

Aruba Certified Design Expert Written Exam 試験

最新更新時間: 2024/03/18,合計60問。

【2024年3月キャンペーン】:HPE6-A80 最新真題を買う時、日本語版と英語版両方を同時に獲得できます。

実際の問題集を練習し、試験のポイントを了解し、テストに申し込むするかどうかを決めることができます。

さらに試験準備時間の35%を節約するには、HPE6-A80 問題集を使用してください。

 / 1

Question No : 1
Refer to the exhibit.
A customer has an existing network with ArubaOS switches, Aruba 7205 controller, and 802.11ac APs. The customer needs a wired upgrade for their campus network and wireless upgrade with 802,11ax APs and would like to get all the functions of AP.
The customer has one building with 3 floors with the following wired devices,
* 200 VOIP phones
* 8 printers
* security cameras
The architect plans to propose 75 AP-535s.
The security cameras are a high definition pan-tilt-zoom with heaters for harsh
environments that require more than 45 W to function,
Which exhibit shows an access switch mat meets the customer needs?
A)



B)



C)



D)



正解:

Question No : 2
What is one customer requirement that can drive the need for a relatively dense AP deployment. In which ire coverage areas of at least three AP radios overlap?

正解:

Question No : 3
Referto the exhibit.



A hospital needs an upgrade to 802.1tax for its wireless network.
The wireless network supports:
* wireless medical devices
* medical staff voice communicators
* laptops in nurse stations
* medical staff tablets
* visitor and patient personal devices.
All of these devices support both the 2 4GHz and 5GH2 band. Assuming about a max throughput on50 Mbps per AP; the hospital would like. The architect has used VisualRF to plan the AP placement on one of the floors, which the hospital expects will need to suppod about 800 win to deploy APS in stairwells between floors.
How well does the plan meet the requirements?

正解:

Question No : 4
An archinect needs lo plan a Mobility Master (MM) solution for a customer Requirements include:
* redundancy for the MM
* redundancy for the MCS (seamless failover if up to one fails). The wireless network consists of
* total APs - 300
* total wireless devices = 20,000
* total MCs = 10
The customer wants the most cost-effective plan that meets me requirements.
Which plan for MMs should the architect select?

正解:

Question No : 5
Refer to the exhibit.



A customer needs to create a proposal for a full wireless solution for a customer. The customer has indicated that the MCs will connect to Aru&a CX Switches at the core and the APs will connect to PoE-i- switches at the edge. The customer requires that the wireless solution support at least 50 Mbps concurrently per AP. The architect has created a BOM tor a Mobility Master (MM), two MC 721os, and 400 AP-535S. me exhibit snows this BOM.
Which components has the architect forgotten?

正解:

Question No : 6
Refer to the exhibit.



A stadium wants to deploy location-based services, including blue-dot wayfinding over a 200.000 square root (isr580 sq. m) area. The custom past particular areas. The customer has selected a 1 year subscription.
The exhibit shows the BOM that the architect created in iris.
Which correction should the architect make?

正解:

Question No : 7
Refer to the exhibit.



This warehouse has the dimensions shown in the exhibit. The warehouse is 20 feet (6 m) high up to a steel railing on the celling. The shelves are about 16 feet (5m) high, and they hold large containers filled with fluid and metal equipment.
The customer needs consistent wireless coverage throughout the warehouse, mostly to support the tablets that employees use to run Inventory tracking and other applications. The warehouse staff works in shifts of 20.
The architect has selected AP-515S.
About how many APs should the architect propose?

正解:

Question No : 8
A customer has an Aruba wireless network. which includes two MC 7205s and an MM at the network core. The company now wants to accommodate 50 mobile trainers These trainers travel around the world and run training events. The trainers often need to access materials in the company data center, but cannot reach materials when they are on the road.
The company wants to give the mobile workforce a secure way to reach the materials they need no matter where they are.
including in public spaces like the hotels where they often leach. The customer also requires that the solution be as cost effective as possible while meeting the requirements.
Which plan meets the needs of the mobile Trainers?

正解:

Question No : 9
Refer to the exhibit.



The exhibit shows the current AP deployment in a school. This customer indicates that the current wireless performance is inadequate and w B02.11ax.
For the new' solution, what should the network architect recommend?

正解:

Question No : 10
A mall requires a wireless network upgrade to 802 -Max. The company that owns the mall wants to provide the APs for the entire mall. However, several of the larger national chain retailers with spaces in the mall want to offer wireless services with their own SSIDs.
These individual retailers also have their own wireless guest services and wireless client devices They have their own corporate infrastructure and want to handle all of this wireless traffic on their own, including terminating the traffic on their own controllers. The mall requires redundancy for its services, out the retailers do not.
Which plan for mobility controllers (MCs) and mobility master (MW) meets the needs of this scenario?

正解:

Question No : 11
Refer to the exhibit.



The exhibit shows the design for an existing network. The customer intends to replace the current Core switches with two Aruba 8400 switches.
What are two points that the architect should ensure that the customer understands? (Select two.)

正解:

Question No : 12
A network architect needs to plan quality of service (QoS) for a hospital network.
Which of these applications should receive the highest priority?

正解:

Question No : 13
An indoor basKetbaiI stadium has 5.000 seats in two rings:
•. The stadium has a ceiling height of GO feet (18 m).
• There is a catwalk around the perimeter of the basketball court, between the court and the seating areas.
• This catwalk is 40 feet (12 m) from the floor.
• There are two scoreboards at either end of the stadium.
•. The construction of the stadium is concrete and sleet.
The customer does not want an under-seat, picoceli deployment.
Which AP model is appropriate to provide coverage in the main stadium bawl?

正解:

Question No : 14
Refer to the exhibit.



The network architect has created the 60M shown in the exhibit tor a complete new wired ana wireless solution for a customer. This solution the customer wants to discover and manage every component or the network in Airwave, including twins, MCS, APS, and switches.
How many AirWave licenses dees the architect need to add?

正解:

Question No : 15
A retailer wants to add a wireless network to its stores to provide guest access. The store has wired POS systems which the customer will now replace with wireless systems.
What is one Important security action that the wireless solution supports to comply with PCI DSS?

正解:

 / 1