Question No : 1
Regarding the adjustable battery of the UPS5000-E, when one battery fails, at least () batteries need to be removed. Then, set the corresponding number of batteries on the monitoring panel.

正解:

Question No : 2
The NetEco management system adopts a high-capacity design architecture, supporting massive device access. It supports up to ( ) tens of thousands of measurement points using a single x86 server, while maintaining smooth system operation and CPU utilization not exceeding ().

正解:

Question No : 3
The battery type supported by UPS2000-G is ().

正解:

Question No : 4
The door types in Huawei Fusionmodule2000V3.0 include ().

正解:

Question No : 5
Huawei Technologies Co., Ltd. is a ( ) of the GB50174-2008 standard and a () of the GB50174-2017 standard.

正解:

Question No : 6
What pole circuit breaker is typically selected for the external maintenance bypass of a UPS system?

正解:

Question No : 7
Traditional UPS systems have fixed battery cell counts, resulting in high battery maintenance costs; the failure of a single battery may necessitate replacing the entire battery pack. The UPS5000-A features adjustable battery cell counts. What is the adjustable range?

正解:

Question No : 8
A project requires the management system to connect to one generator set, two smart meters (of the same model), and two precision air conditioners (of the same model) from a third party. How many third-party device access fees should the management system report?

正解:

Question No : 9
When using a single RH5885 server, what is the maximum number of tens of thousands of test points that the NetEco management system can support for centralized management of multiple data centers?

正解:

Question No : 10
When the NetEco management system intervenes in third-party devices surrounding the micro-module, what monitoring hardware is typically used for access?

正解:

Question No : 11
UPS5000-A/E models above 400KVA are available in standard and enhanced versions. The standard version comes standard with a () disconnect switch.

正解:

Question No : 12
Assume a battery specification states a discharge power of [email protected]@15min. If the system requirement is 1400W, then the number of battery packs selected is ().

正解:

Question No : 13
The UPS500-A-400/500K can support a maximum of () parallel operation, and has good scalability.

正解:

Question No : 14
For a UPS5000-E 100kVA, which of the following input switches is most suitable?

正解:

Question No : 15
Which of the following features is a standard feature of the NETCOL8000-C air conditioner?

正解: