Question No : 1
The "Design Standard for Cooling and Air Conditioning of Data Centers" (T/CECS487-2017) stipulates that when a data center is co-located with other functional rooms in the same building or campus, the cooling source of the data center should not be shared with the cooling sources of other functional rooms (such as comfort air conditioners). What are the main reasons for this? (Multiple choice)

正解:

Question No : 2
What procedures are required for configuring the air conditioning terminals of a data center cooling system? (Multiple choice)

正解:

Question No : 3
The main impacts of site selection on refrigeration systems are reflected in which of the following options? (Multiple choice)

正解:

Question No : 4
What is the approximate percentage of hybrid mode operation in Huawei's indirect evaporative cooling system?

正解:

Question No : 5
What is the approximate percentage of wet mode operation in Huawei's indirect evaporative cooling system?

正解:

Question No : 6
What is the PUE of FusionDC in an indirect evaporative cooling scenario?

正解:

Question No : 7
What is the approximate percentage of dry mode operation in Huawei's indirect evaporative cooling system?

正解:

Question No : 8
What is the CLF value that Huawei's indirect evaporative cooling system can achieve?

正解:

Question No : 9
Which of the following descriptions about data center monitoring systems is wrong?

正解:

Question No : 10
Which of the following is an N+1 scenario involving spanning multiple rows?
A)



B)



C)



D)



正解:

Question No : 11
Which of the following is the control component of the containment aisle door in a modular data center?

正解:

Question No : 12
Which of the following systems can effectively manage and record personnel access to and from a data center?

正解:

Question No : 13
Which of the following recommendations regarding the selection of data center monitoring hardware is wrong?

正解:

Question No : 14
The UPS5000 (30C120 kVA power module) has a compact footprint, saving data center space. What is its approximate footprint area?

正解:

Question No : 15
The voltage drop of DC cables should be controlled within which of the following limits?