Question No : 1
Thing or activity with a potential for con- sequence
正解:
Question No : 2
Reliability efforts, such as reliability centered maintenance (rcm), can be linked with rbi, resulting in an integrated program to
正解:
Question No : 3
Who can provide useful input (such as the spectrum of process conditions, injection points etc.) To aid materials specialists in the identification of deterioration mechanisms and rates
正解:
Question No : 4
Method used for consequence analysis should demonstrate the ability to provide
正解:
Question No : 5
The ability to state the rate of deterioration precisely is affected by the following except
正解:
Question No : 6
The type of failure mode that likely to occur due to ssc
正解:
Question No : 7
Rbi requires the commitment and cooperation of the
正解:
Question No : 8
The following assumption can bemade that significantly impact the calculated corrosion rate early in the equipment life
正解:
Question No : 9
_________________curves are referred for the deterioration mechanismfor carbon and low ally steel materials.
正解:
Question No : 10
______________to be established to judge acceptability of risk couldhe an objective of the rbi assessment if such criteria do not exist already within the user's company.
正解:
Question No : 11
Consequence side of the risk equation is normally managed by
正解:
Question No : 12
Following are the non-inspection mitigation actions except one
正解:
Question No : 13
Through__________________, inspection activities arefocusedonhigher risk items and away from lower risk items.
正解:
Question No : 14
Sec occurs when equipment is exposed to environments
正解:
Question No : 15
The program that is focused on understanding failure modes, addressing the modes and therefore improving the reliability of equipment and process facilities.
正解: